Sitetracker teams with char.gy to power UK EV charging network expansion​Sitetracker teams with char.gy to power UK EV charging network expansion 

Sitetracker, which provides asset lifecycle management (ALM) for critical infrastructure, has formed a strategic partnership with UK-based EV charging company char.gy.

char.gy aims to scale its infrastructure to over 30,000 public charging points by 2030. Sitetracker will provide the digital foundation to streamline, standardize and accelerate deployment.

char.gy installs EV chargers in lampposts to make it easier for drivers without off-street parking to charge conveniently near their homes. The model reduces infrastructure complexity by leveraging existing street assets, creating accessible charging networks in dense urban environments.

The company has a footprint of over 3,600 charging points. It has chosen Sitetracker for its ability to digitize and orchestrate each step of the asset lifecycle, from planning and installation to ongoing maintenance.

Sitetracker’s platform enables coordination between contractors, local authorities, and internal teams—accelerating approvals, reducing administrative burden and ensuring consistent delivery.

The platform will allow char.gy to standardize high-volume deployments with repeatable, automated workflows; gain real-time insight into project status, survey data, field activity and issue resolution; and improve productivity through mobile-enabled tools that enable field teams to capture data, upload photos and sync with central operations instantly.

This will help char.gy keep pace with demand, reduce project timelines and maintain service levels.

“As we scale from thousands to tens of thousands of charging points, Sitetracker is the operational backbone we need,” said Alastair Woods, Chief Operating Officer at char.gy. “The platform provides the visibility and control required to deliver fast, efficient rollouts.”

Source: Sitetracker

Leave a Reply